FAQ
Questions buyers ask us.
Straight answers on certification, capabilities and how a project runs. Answers marked [confirm] are being checked with our engineering team.
Can’t find your question?
Call 514-642-4431 or write to info@dimartech.com. An engineer answers, in English or French.
All the ways to reach usAre you ASME certified?
Yes. Dimartech holds ASME Certificate of Authorization no. 42263 for the U stamp, Section VIII Division 1, and registers vessels with the National Board.
Do you register CRNs for Canadian provinces?
[Answer to write with John: which provinces, who files, typical timing.]
Who signs off the engineering?
Calculations are prepared under our president, a professional engineer licensed in Quebec, Ontario and Alberta, and submitted to your Authorized Inspector for acceptance before fabrication starts.
What equipment do you build?
Pressure vessels and reactors, separators and columns, water pumping columns, and rotary equipment such as kilns, calciners and air separators, built to ASME Section VIII Division 1. See Capabilities.
What size and weight can you build?
[Answer to write with John: maximum diameter, length, wall thickness and lift weight.]
Can you work from our drawings, or do you design?
Both. We build to your drawings, review them before we quote, or complete the mechanical design when it isn’t finished: on one reactor vessel, about 70% of the design was done when the order was placed. [confirm the services list with John]
What testing and documentation do we get?
Nondestructive examination as the code and your spec require (RT, UT, PT and PMI), a hydrostatic test, and a data book with the U-1A report and as-built drawings. [confirm the standard data book contents]
What is a Pre-Fabrication Analysis?
Before we quote, an engineer reviews your drawing or spec and tells you what drives cost and lead time, and what we would change. [confirm whether it’s free and the turnaround]
How fast will we get a quote?
[Answer to write with John: typical response time for a ROM estimate and a firm bid.]
Do you ship to the United States?
[Answer to write with John: US projects, freight and the U stamp.]
Your project
Have a spec in hand? Send us the drawing.
An engineer reviews every request and tells you what we’d change before we quote.