Pressure vessels, reactors, columns, separators and rotary equipment in carbon steel, stainless, duplex and nickel alloys. Every job starts with an engineer reading your drawing [confirm: every order].
ASME U · Certificate no. 42263 · National Board registered
Fig. 1 — Horizontal pressure vessel, ASME VIII-1 · illustrative
What we build
We build four kinds of equipment, all engineered by the same team.
Every capability below is designed, calculated and built in the same Montréal shop, with the drawing checked before the steel is cut.
ASME VIII-1 · U stamp
Pressure vessels & reactors
Code-stamped vessels and reactors, from first-of-a-kind reactors to repeat OEM vessels.
Plate
Up to 4 in [confirm]
Clad
SS316L
Pressure
1,200 psi (Enerkem)
Separation
Separators & columns
Gas, RNG and oil-and-gas separators, adsorption vessels and self-supporting columns.
Service
Gas · RNG · oil & gas
Columns
Self-supporting
Internals
Trays, mist pads [confirm]
Water & wastewater
Water pumping columns
Suction cans and pumping columns over 30 ft, held to tight vertical tolerance with sequenced welding.
Length
30 ft+
Alignment
Held in field (Sulzer)
Method
Weld sequencing
Rotary & air separation
Rotary equipment & air separators
Rotary kilns, calciners, dryers and air separators for mineral and process plants.
Equipment
Kilns · calciners · dryers
Sector
Mining & aggregate
Scope
Fabrication [confirm]
Engineering & design
The engineering comes first, so the fabrication goes right.
This is the path every drawing takes through Dimartech. Steps 02 and 03 are where design problems get caught, on paper, before they cost you in the shop or the field.
01
Your drawing or spec
P&ID, GA, datasheet or a problem
02
Design review
Code, materials, schedule, what we’d change
03
Calculations
ASME VIII-1, FEA, fatigue where needed
04
Fabrication drawings
Issued for your approval
05
Inspector acceptance
Calculations to your Authorized Inspector
06
Build, test, document
NDE, hydro, U-1A and the data book
Steps 02 and 03 make up the Pre-Fabrication Analysis. You see it before you commit [confirm terms].
Design review and redesign
When long-lead Inconel threatened a refinery shutdown, we redesigned the part with an overlay and met the date (AZZ).
Calculations and FEA
Fatigue analysis for vessels rated to 2,000,000 cycles, with 100% RT on every butt weld (Guild).
Design for manufacture
A prototype gasifier improved over three orders until it became a commercial product.
Spec sheet
Codes, materials and processes.
The short version of what your supplier file asks for. Items marked [confirm] are being verified with our quality team.
Codes & stamps
ASME Section VIII, Division 1 (U stamp), Certificate of Authorization no. 42263 · National Board registered · CRN [confirm provinces] · CSA B51 [confirm]
Materials
Carbon steel (e.g. SA-516-70) · stainless 304L / 316L · duplex · nickel alloys, including Inconel overlay
Welding & NDE
Qualified welders and procedures [confirm CWB W47.1] · RT, UT, MT and PT to your spec · PMI · hydrostatic test
Heat treatment & finishing
PWHT · machining · coatings · passivation, through a long-standing partner network
Shop
Pointe-aux-Trembles, Montréal · automated submerged-arc welding tower · turning rolls over 160 t · overhead cranes 30 t and 12 t [confirm] · maximum dimensions [confirm]
Documentation
U-1A data report · material test reports · NDE records · as-builts · bound, indexed data book
Certifications & quality
Qualify us in minutes.
Certificate numbers and issuing bodies, ready for your vendor file.
Verified
ASME U stamp
Certificate no. 42263 · Section VIII, Div. 1
Verified
National Board
Registered vessels (NB mark)
[confirm]
CRN
Canadian Registration Numbers by province
[confirm]
Quality system
CWB W47.1 · ISO 9001
Pre-Fabrication Analysis
Send a drawing. Get an engineer’s read on it.
What drives cost, what drives lead time, and what we’d change, with a firm bid or ROM estimate. Your drawings stay confidential.
Pre-Fabrication Analysis · sample layout
[Your project] · [Equipment] · Rev 0
01 · Cost drivers
Material grade, plate thickness, NDE scope
02 · Lead-time drivers
Long-lead forgings and alloys, inspector holds
03 · What we’d change
Design options that keep code and schedule
04 · Price
Firm bid or ROM estimate