Industries
Built for the codes your industry answers to.
Refineries, water utilities, mines, cooling OEMs and technology developers all need equipment that passes inspection and arrives before the shutdown starts. This is where we’ve done it.
Pressure vessels & reactors
Separators & columns
Pumping columns
Rotary & towers
Filled: delivered (named project) · Outline: in scope [confirm]
Where we work
Six places our equipment goes to work.
Two core markets, one growth market, and the first-of-a-kind work that proves what our engineers can do.
Core market
Petrochemical & energy
Code-stamped vessels, separators, columns and reactors for capital projects and fixed-date shutdowns at refineries, chemical plants and energy producers.
Proof
Inconel redesign that met a refinery shutdown date (AZZ / Sinclair)
Typical requirements
ASME VIII-1 · National Board · CRN [confirm]
Core market
Water & wastewater
Pumping-station columns, suction cans, process vessels and tanks, built to tight tolerance and in repeat batches for OEMs and treatment projects.
Proof
Columns over 30 ft held plumb in the field (Sulzer)
Typical requirements
Tight vertical tolerance · repeat batches
Growth market
Data-centre cooling
Buffer and expansion tanks, separators and custom vessels for chiller and CDU skids, identical unit after unit [confirm range].
Proof
Six identical vessels held to 1/16 in (Guild)
Heavy industry
Mining & metals
Towers, kilns, calciners and dryers, plus like-for-like replacements at end of life.
Proof
Tower replacement with a removable plate (Glencore)
First-of-a-kind
Clean technology
First commercial reactors, columns and separators for waste-to-fuel, RNG and energy storage.
Proof
Completed the last 30% of a reactor design (Enerkem)
For contractors
EPC contractors
A code-stamped Quebec fabricator that protects your schedule and your audit file.
Proof
Fixed shutdown date met with a redesign (AZZ)
Where we fit
The earlier we see the drawing, the more we can save you.
A typical capital project or shutdown, and where Dimartech works on it. The Pre-Fabrication Analysis sits before award, while changes are still cheap.
01
Concept
02
FEED / spec
03
RFQ
04
Award
05
Fabrication
06
Inspect & ship
07
Start-up
08
Operate
Delivery
Built in Montréal and delivered across North America.
English and French [confirm: whole team], with equipment shipped to sites across Canada and the United States.
Data-centre cooling
Building cooling platforms? Start with the kit.
Capability sheet, proof story and the 10-decision spec checklist. Three pages, and no sales call required.